The building continues to change on a daily basis both inside and out with work internally progressing at a rapid pace.  We have electricity now which has allowed the generator to finally be retired and the site is surprisingly quiet.

The outside has been cleared right the way round in preparation for the finishing surface to be laid and the inside has transformed again in two weeks with the main hall getting it's plasterboard coat (nearly 500 plasterboards installed in a week!).

The wall connecting the main auditorium to the building has also been lined with special sound boards to prevent sounds (and fire) spreading into the main building.

Lights are being fitted next week and the plastering will start on the main hall.  It's taking shape fast.