Lots has been going on at the site over the last four weeks but this week has seen the start of the timber frame structure going up. It's obviously a very exciting time to see the building start to take shape and the main hall walls and roof are already on after the first week!
For those that haven't had a chance to get down to site here is a short timelapse for the first 4 days. The last day (Friday) which hasn't been captured saw the roof installed onto the frame.
I'll try to update on a weekly basis now with a time lapse for every week.