16 July - Week 22

The building continues to take shape with the foundations and floor at the back of the building completed.  Drainage work is taking place now around the perimeter of the building because the clay based soil is so good at holding water that we have needed to invest in some special drainage to remove surface water.

The timber frame work is looking set for the end of August now so work is continuing on the rest of the foundations, drainage work and service ducts.